Fixed Transition Flashing - Low To High - Part #WS-116

Fixed transition flashing means that the standing seam panels will be pinned in place at the transition. If you have a fixed point at the transition, you will need a floating connection at the other end of the standing seam panel.

This is our most popular low to high transition flashing.

Transition flashing is used when you have a roof that has two different pitches. The transition trim is located where the two different pitches meet so the metal roof does not leak. Transition flashing is also referred to as pitch break trim and comes high to low or low to high.

WS-116 - FIXED TRANSITION - LOW TO HIGH - PARTS LIST

This parts list is designed to help you calculate the quantity of accessories that you’ll need for your trim installation. It has all of the accessories that are needed to install 1 full piece of trim, which is 120" long. To calculate the total number of accessories you will need for your job, simply take the number of trim pieces associated with the trim part purchased and multiply the list by that number for a total for your project.

Components List

  • 1 Piece Transition Flashing - WS-116
    Roof Pitch Required (Both Sides)
  • 1 Piece Joggle Cleat - WS-105
  • 1 Piece Zee Closure - WS-114
  • 56 Pancake Head Screws (#10X1") NO Washer
    Verify Metal To Wood
  • 10 Metal To Metal Lap Screws With Sealing Washer
  • 30 Linear Feet Of Double Sided Butyl Tape, 3/16" X 7/8"
  • 2 Tubes Butyl Sealant
  • 1/4 Tube Silicone Sealant